Coming back from Winter Break, the first order of business for the entire Small Scale Superway team was to finalize the Bill of Materials for our respective sub-teams. The Track and Manufacturing team searched the shop for materials to lower the final cost, but could not find useful parts. As such, the final BOM came out to $1447.11. This can be seen in Table 1.
Supplier (I.E., Amazon..)
|
Description
|
Quantity
|
Unit Cost (include taxes)
|
Shipping Cost
|
Total
|
Amazon
|
Filament 1.75mm 1 kg
|
10
|
$ 24.02
|
$ -
|
$ 240.20
|
McMaster
|
Steel Phillips Rounded Head
Screw (50mm/2 inch) - 25 per package
|
5
|
$ 7.65
|
$ 38.24
|
|
McMaster
|
Zinc-Plated Steel Hex Nut -
100 per package
|
4
|
$2.94
|
$ 11.76
|
|
McMaster
|
Steel Narrow-Base Weld Nut (50)
|
2
|
$10.38
|
$ 20.76
|
|
McMaster
|
Rotating-Eye Padlockable Hasp
|
1
|
$12.02
|
$ 12.02
|
|
McMaster
|
Unfinished Brass Surface-Mount Hinge with
Holes
|
1
|
$1.56
|
$ 1.56
|
|
McMaster
|
Steel Hex Nut 5/16"-18 Thread Size
|
1
|
$4.57
|
$ 4.57
|
|
McMaster
|
Steel Phillips Flat Head Screws - 100
|
3
|
$ 7.87
|
$ 23.60
|
|
Midwest Steel and Aluminum
|
6061 Flat Aluminum Bar (0.25 x 1 x 48)
|
80
|
$ 4.15
|
$ 87.17
|
$ 419.29
|
Home Depot
|
12 in. x 48 in. Tube for
Concrete
|
3
|
$ 17.45
|
$ 52.34
|
|
Home Depot
|
60 lb bag Sakrete Concrete Mix (Yields 0.45
cubic feet)
|
14
|
$ 3.24
|
$ 45.43
|
|
Gorilla Metals
|
Square Tub 1 x 1 1 0.065 (per ft)
|
80
|
$ 1.37
|
$ 109.25
|
|
Gorilla Metals
|
Square Tube 1.25 x 1.25 x 0.065 (per ft)
|
40
|
$ 2.19
|
$ 87.40
|
|
Gorilla Metals
|
Band Sawing Labor
|
1
|
$ 40.00
|
$ 40.00
|
|
Midwest Steel and Aluminum
|
Steel Sheets 16 gauge 4 x 4
|
22
|
$ 0.96
|
$ 18.62
|
$ 39.77
|
Shop
|
Plywood
|
$ -
|
|||
Harbor Freight
|
Ring Roller
|
1
|
$ 76.46
|
$ 76.46
|
|
Midwest Steel and Aluminum
|
Hot Roll Steel Flat Bar
|
80
|
$ 0.99
|
$ 43.00
|
$ 122.53
|
McMaster
|
Grade 8 Steel, 5/16"-18 Thread Size,
2" Long, Fully Threaded (10 per pack)
|
10
|
$ 9.66
|
$ 96.58
|
|
McMaster
|
High-Strength Steel Hex Nut - 100
|
1
|
$ 5.36
|
$ 5.36
|
|
Total
|
$ 1,447.11
|
Table 1: Small Scale Track and Manufacturing BOM
For the rest of the meeting, our team is preparing for the Spartan Superway Lightning talks.